I have experienced three unexpected problems.
1. Very critical. In the Month view, click next month or previous month, the calendar jumps. For example, from April to June directly without seeing May. To reproduce, please go to March, 2008, click next month, see what gonna happen. (In the demo basic feature page)
2. Drag and Drop error inside user control. Put the Schedule control inside of User Control, aand then put the user control inside of aspx page which belongs to a MAster Page, when drag drop an appointment, produce a script error (error 500). This happens only when put inside of a user control.
3. Wierd layout problem in Month view. A picture attached. The bottom is no border.
problem_2d2aa2a5.zip